We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Design and Development Services.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Design and Development Services×Wave Technology - List of Manufacturers, Suppliers, Companies and Products

Design and Development Services Product List

1~11 item / All 11 items

Displayed results

[Data] WTI Blog November 2016 - March 2017

Featuring WTI's anechoic chamber rental and EMI countermeasure verification services, as well as wireless power transmission design services!

This document summarizes the WTI blog of Wave Technology Co., Ltd., which is engaged in the "Development Design Promotion Business" to solve the shortage of engineers, from November 7, 2016, to March 21, 2017. It introduces various services such as EMI support starting from the fully booked reservation of the anechoic chamber on November 7, 2016, the rental of the anechoic chamber and EMI countermeasure verification service on December 7, 2016, and the wireless power transfer design service on January 24, 2017. In addition, we have included a wealth of useful information related to products and industries. We encourage you to read through it. [Contents] ■ November 7, 2016 ■ December 7, 2016 - December 27, 2016 ■ January 10, 2017 - January 24, 2017 ■ February 3, 2017 - February 28, 2017 ■ March 7, 2017 - March 21, 2017 *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] President's Blog March 2021

Three reasons why WTI internships are chosen are featured!

This document summarizes the president's blog of Wave Technology Co., Ltd., a "development design promotion business" that addresses the shortage of engineers, from March 2, 2021, to March 12, 2021. It introduces various posts, including the March 5, 2021 entry titled "Press Release on March 3 - Starting the Provision of High-Precision Positioning Technology Using Distance Measuring Lasers and Magnetic Sensors," and the March 12, 2021 entry "Three Reasons Why WTI's Internship is Chosen." Additionally, it contains a wealth of useful information regarding products and industries. We encourage you to read it. [Contents (Excerpt)] ■ March 2, 2021 Announcement of Exhibition Participation from March 9 at Aichi Prefectural International Exhibition Center - We will conduct demo runs and presentations. ■ March 4, 2021 "I Can't Find Time for Design!" - Are you unable to focus on your original design due to being overwhelmed by trouble countermeasures, prototype evaluations, environmental impact substance investigations, and EOL (end-of-life) responses? *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] President's Blog April 2021

Answer to the student's question: "What is the president's motivation?" will be published!

This document summarizes the president's blog of Wave Technology Co., Ltd., which is a "development design promotion business" aimed at solving the shortage of engineers, from April 6, 2021, to April 28, 2021. It includes highlights such as the April 9, 2021 entry titled "Answer to a Student's Question: 'What is the President's Motivation?'" and the April 28, 2021 entry "Are Designers Able to Spend Time on 'Design'?" Additionally, it features a wealth of useful information regarding products and the industry. We encourage you to read it. [Contents] ■ April 6, 2021: The president's birthday gift presentation to employees has reached its fifth year. ■ April 9, 2021: Answer to a student's question: "What is the President's Motivation?" ■ April 21, 2021: Released presentation video of our exhibition at the International Logistics Comprehensive Exhibition 2021 in Aichi (March 9-12). ■ April 28, 2021: Are designers able to spend time on 'design'? *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] WTI Blog December 2021

Introducing topics such as "Discussion on Wi-Fi communication standards" and "What does quality assurance do? - Failure analysis method FTA edition"!

This document summarizes the WTI blog of Wave Technology Co., Ltd., which is engaged in the "Development Design Promotion Business" to solve the shortage of engineers, from December 7, 2021, to December 28, 2021. It introduces topics such as "Discussion on Wi-Fi Communication Standards" from December 7, 2021, "Easy Spice Simulation with Behavior" from December 21, 2021, and "Introduction to Semiconductor Package Assembly Process 'Wire Bond'" from December 28, 2021. In addition, we have published a wealth of useful information related to products and industries. We encourage you to read it. [Contents] ■ December 7, 2021: Discussion on Wi-Fi Communication Standards ■ December 14, 2021: What Does Quality Assurance Do? - Fault Analysis Method FTA Edition ■ December 21, 2021: Easy Spice Simulation with Behavior ■ December 28, 2021: Introduction to Semiconductor Package Assembly Process 'Wire Bond' *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Technosherpa Blog January 2021 - December 2021

Published articles such as 'Overview of EMC Standards' and 'Do you know about long-term storage technology for semiconductor products?'

This document summarizes the Tech Sherpa blog from January 8, 2021, to December 20, 2021. Starting with "Utilizing Experts is Recommended for Troublesome Issues" on January 8, 2021, it also includes "What is EMC Anyway? - Basic Definitions and History of EMC" from February 18, 2021, and "What Performance Tests are Available for Semiconductor Packaging Materials?" from April 26, 2021. We provide detailed explanations using photos and diagrams. Please take a moment to read it. [Contents (Excerpt)] ■ January 8, 2021: Utilizing Experts is Recommended for Troublesome Issues ■ January 13, 2021: We will exhibit at "International Logistics Comprehensive Exhibition 2021 in Aichi" ■ February 5, 2021: Would you like to investigate the design rules for semiconductor IC packages? ■ February 18, 2021: What is EMC Anyway? - Basic Definitions and History of EMC *For more details, please refer to the PDF document or feel free to contact us.

  • Other services
  • Other contract services
  • Technical Seminar

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Technosherpa Blog April 2018 - March 2019

"Requests" received by Techno-Sherpa, and more, are compiled in the Techno-Sherpa blog!

"Techno-Sherpa" is a professional training service that includes educating engineers on the transmission of high-precision position detection technology. This document summarizes the Techno-Sherpa blog from April 1, 2018, to April 27, 2018. It features articles such as "What Requests Do We Receive for Techno-Sherpa?" from April 1, 2018, "To Prevent Our In-House Technology from Hollowing Out" from April 8, 2018, and "I Want Our Engineers to Learn Electronics!" from April 16, 2018. Please take a moment to read it. [Contents] ■ April 1, 2018: What Requests Do We Receive for Techno-Sherpa? ■ April 8, 2018: To Prevent Our In-House Technology from Hollowing Out ■ April 16, 2018: I Want Our Engineers to Learn Electronics! ■ April 27, 2018: Will I Be Able to Design After Taking the Technical Course? *For more details, please refer to the PDF document or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] WTI Blog May 2021

The article includes discussions on conflict mineral investigations and safety measures during power supply evaluations!

This document summarizes the WTI blog of Wave Technology Co., Ltd., which is engaged in the "Development Design Promotion Business" to solve the shortage of engineers, from May 10, 2021, to May 25, 2021. It introduces topics such as the "Technical Compliance Agency Service for UWB Devices" on May 10, 2021, the "Safety Measures During Power Evaluation" on May 17, 2021, and "Electrical Design of Medical Devices" on May 25, 2021. Additionally, it includes a wealth of useful information related to products and industries. We encourage you to read it. [Contents (excerpt)] ■ May 10, 2021: Technical Compliance Agency Service for UWB Devices ■ May 11, 2021: Introduction to Principle Verification ■ May 13, 2021: What is Conflict Mineral Investigation? ■ May 14, 2021: The Ventilation Policy for Electronic Devices and Rooms is the Same - Setting Up Inlets and Outlets for Air ■ May 17, 2021: Discussion on Safety Measures During Power Evaluation *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] WTI Blog Agency Service Edition Fiscal Year 2018 to 2020

We are introducing services that help reduce the cost of wireless modules.

This document summarizes the WTI blog and proxy services of Wave Technology Co., Ltd., which is engaged in the "Development Design Promotion Business" to solve the shortage of engineers, covering the period from 2018 to 2020. It introduces various topics, starting with "What is Technical Standards Conformity Certification? (What is Giteki?)" on March 26, 2019, as well as "How to Reduce Costs for Wireless Modules" on July 9, 2019, and "What Should Be Prepared for Technical Standards Conformity Certification (Giteki) Application?" on February 4, 2020. Additionally, we have published a wealth of useful information regarding products and industries. We encourage you to read through it. [Published Content (Excerpt)] ■ February 27, 2018: Antenna Design, Evaluation, and Certification Application (Support for Analysis and Improvement of Existing Development Products) ■ January 8, 2019: Connecting All People and Things Wirelessly ■ March 26, 2019: What is Technical Standards Conformity Certification? (What is Giteki?) ■ July 2, 2019: We have started a proxy service for investigating chemical substances contained in products! ■ July 9, 2019: How to Reduce Costs for Wireless Modules *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] President's Blog July 2021 - December 2021

Introducing topics such as 'The complexity of the supply chain requires a dual approach to development and design!'

This document summarizes the president's blog of Wave Technology Co., Ltd., which is engaged in the "Development Design Promotion Business" to solve the shortage of engineers, from July 7, 2021, to December 3, 2021. It introduces various posts, starting with "Nice to meet you, I'm Nakano" on July 7, 2021, as well as "What is WTI's proud training program?" on October 22, 2021, and "WTI's anechoic chamber has become even easier to use!" on December 3, 2021. Additionally, it includes a wealth of useful information regarding products and the industry. Please take a moment to read it. [Contents (excerpt)] ■ July 7, 2021: Nice to meet you, I'm Nakano ■ August 31, 2021: Are you prepared for regulations on chemical substances in products? ■ September 14, 2021: Technology is shifting from "enhancement" to "co-creation" *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Embedded system design service
  • Circuit board design and manufacturing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Shirutoku Report No. 26 # Parts Replacement Consideration

Consideration to meet product specifications! Examples of component layout taking electrical characteristics into account are included!

★★Shirutoku Report: Useful Information You Should Know★★ This report introduces considerations for component placement. It is rare to use a circuit board in isolation; it is often housed in a case or connected to other devices. In component placement considerations, we first position components that cannot be moved structurally, such as connectors and switches. For other components, we proceed with the placement while paying attention to structural placement constraints (height limitations of components, prohibited areas for placement and wiring). For more details, please take a moment to read through. 【Contents】 ■ Consideration of structural constraints in component placement ■ Placement considerations based on electrical characteristics ■ Wiring considerations *For more information, please refer to the PDF document or feel free to contact us.

  • Printed Circuit Board
  • Other electronic parts

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] WTI Blog April 2022

Introducing topics such as "Standards for the external dimensions of semiconductor packages" and "Is it true that current can become a vortex?"!

This document summarizes the WTI blog of Wave Technology Co., Ltd., which is engaged in the "Development and Design Promotion Business" to solve the shortage of engineers, from April 5, 2022, to April 26, 2022. It introduces topics such as "About the dimensional standards of semiconductor packages" from April 5, 2022, and "Is it true that current becomes a whirlpool?" from April 26, 2022. In addition, it includes a wealth of useful information related to products and industries. We encourage you to read it. [Contents] ■ April 5, 2022: "About the dimensional standards of semiconductor packages" ■ April 12, 2022: Inquiry case studies from substrate manufacturers (sequel) ~ Substrate design also requires adjustments that align with the manufacturing processes of substrate manufacturers ~ ■ April 19, 2022: An era where services are utilized for tasks other than those that the company should focus on ■ April 26, 2022: Is it true that current becomes a whirlpool? *For more details, please refer to the PDF document or feel free to contact us.

  • Other semiconductors
  • Circuit board design and manufacturing
  • Other electronic parts

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration